This project involved the manufacturing and export of drinking water storage tanks for the US Army, adhering to the American Water Works Association (AWWA) standards, during the period 1999–2010. The storage tanks were manufactured in Pakistan and exported to Afghanistan, where they were utilized in military operations and facilities.
The customer for this project was Jamal Aziz Construction, a company likely responsible for the logistics, installation, or infrastructure development related to these tanks in Afghanistan. The focus of the project would have included:
Engineering Design: Ensuring compliance with AWWA standards for potable water storage.
Quality Assurance: Following material and manufacturing standards to meet durability and safety requirements.
Logistics: Coordinating cross-border export to a conflict-affected region.
If you’d like, I can help draft more details or refine the documentation for this project. Let me know!